We know that usually heat treatment
equipment (furnace) maintenance time is long, the entire construction time
ordinary unshaped refractory takes a long time, which greatly affect the normal
production of the enterprise, reduce the production efficiency. In order to
solve this problem, Luoyang Yilong Refractories Co.,Ltd think of the following methods:
1. We can add the composite
explosion-proof agent of high explosion-proof performance;
2. Add the compound water reducing
agent to improve the operating performance, the main purpose is to reduce the
amount of water, so that the material containing low content, decrease the
burst risk in the process of drying;
3. Using phosphate as binder, the
curing time is faster than the cement, rapid hardening to achieve.
Through the above ways to resolve the
construction time of heating furnace, the castable short construction time,
baking temperature quickly, long service life, release time of only about 4h,
and the drying time is shortened to 1-2 days, and conventional castables for
5-7 days compared to oven baking time, saving more than 3 days, can win the
valuable production time enterprise.